A posteriori algorithms for soving problems of joint detection and estimation of seismic waves
Sibirskij žurnal industrialʹnoj matematiki, Tome 18 (2015) no. 4, pp. 9-17.

Voir la notice de l'article provenant de la source Math-Net.Ru

We propose a new approach to finding the entry times for seismic waves in connection with solving the problem of the active geophysical monitoring of the natural environment. The efficiency of this approach is illustrated by some numerical experiments and the example of solving the model problem of the monitoring of the sounding of the borehole source location in oil and gas drilling.
Keywords: geophysical monitoring, natural and technogenic events, detection, a posteriori algorithm, numerical experiment, seismic location, borehole source.
@article{SJIM_2015_18_4_a1,
     author = {G. M. Voskoboinikova and M. S. Khairetdinov},
     title = {A posteriori algorithms for soving problems of joint detection and estimation of seismic waves},
     journal = {Sibirskij \v{z}urnal industrialʹnoj matematiki},
     pages = {9--17},
     publisher = {mathdoc},
     volume = {18},
     number = {4},
     year = {2015},
     language = {ru},
     url = {http://geodesic.mathdoc.fr/item/SJIM_2015_18_4_a1/}
}
TY  - JOUR
AU  - G. M. Voskoboinikova
AU  - M. S. Khairetdinov
TI  - A posteriori algorithms for soving problems of joint detection and estimation of seismic waves
JO  - Sibirskij žurnal industrialʹnoj matematiki
PY  - 2015
SP  - 9
EP  - 17
VL  - 18
IS  - 4
PB  - mathdoc
UR  - http://geodesic.mathdoc.fr/item/SJIM_2015_18_4_a1/
LA  - ru
ID  - SJIM_2015_18_4_a1
ER  - 
%0 Journal Article
%A G. M. Voskoboinikova
%A M. S. Khairetdinov
%T A posteriori algorithms for soving problems of joint detection and estimation of seismic waves
%J Sibirskij žurnal industrialʹnoj matematiki
%D 2015
%P 9-17
%V 18
%N 4
%I mathdoc
%U http://geodesic.mathdoc.fr/item/SJIM_2015_18_4_a1/
%G ru
%F SJIM_2015_18_4_a1
G. M. Voskoboinikova; M. S. Khairetdinov. A posteriori algorithms for soving problems of joint detection and estimation of seismic waves. Sibirskij žurnal industrialʹnoj matematiki, Tome 18 (2015) no. 4, pp. 9-17. http://geodesic.mathdoc.fr/item/SJIM_2015_18_4_a1/

[1] Seismic Tomography, Publ. Company, Dordrecht, 1987

[2] Obnaruzhenie izmeneniya svoistv signalov i dinamicheskikh sistem, Mir, M., 1989

[3] Nikiforov I. V., Posledovatelnoe obnaruzhenie izmeneniya svoistv vremennykh ryadov, Nauka, M., 1983 | MR

[4] Khairetdinov M. S., Omelchenko O. K., Rodionov Yu. I., “Avtomatizirovannaya tekhnologiya lokatsii seismicheskogo istochnika”, Tr. Mezhdunar. konf. “Matematicheskie metody v geofizike”, Ch. 2, Novosibirsk, 2003, 529–535

[5] Khairetdinov M. S., Voskoboinikova G. M., Sedukhina G. F., “Informatsionnaya tekhnologiya seismolokatsii impulsnykh istochnikov”, Vestnik NYaTs RK, 2010, no. 3, 32–39

[6] Khairetdinov M. S., Avrorov S. A., Livenets A. A., “Computing technology in seismic monitoring networks and systems”, Bull. Novosibirsk Computing Center. Ser. Mathematical Modeling in Geophysics, 2010, no. 13, 51–69 | Zbl

[7] Lyubushin A. A., “Veivlet-agregirovannyi signal i sinkhronnye vspleski v zadachakh geofizicheskogo monitoringa i prognoza zemletryasenii”, Fizika Zemli, 2000, no. 3, 20–30

[8] Sagaidachnaya O. M., Dunaeva K. A., Salnikov A. S., “Dekompozitsiya i analiz seismicheskikh polei na osnove sloev veivlet-razlozheniya”, Geofizika, 2010, no. 5, 9–17

[9] Kel'manov A. V., Jeon B., “A posteriori joint detection and discrimination of pulses in a quasiperiodic pulse train”, IEEE Trans. Signal Processing, 52:3 (2004), 645–656 | DOI | MR

[10] Gruber P., Todtli J., “Estimation of quasiperiodic signal parameters by means of dynamic signal modes”, IEEE Trans. Signal Processing, 42:3 (1994), 552–562 | DOI

[11] Voskoboinikova G. M., Aposteriornye vychislitelnye algoritmy i programmy v zadachakh geofizicheskogo monitoringa, Dis. $\dots$ kand. tekhn. nauk: 05.13.17, Novosibirsk, 2014

[12] Woskoboynikova G. M., “Determination of the arrival times of the seismic by the dynamic programming method”, Proc. 9 Korean-Russian Internat. Symp. “Science Technology” (KORUS 2005), NSTU, Novosibirsk, 2005, 734–737

[13] Geri M., Dzhonson D., Vychislitelnye mashiny i trudnoreshaemye zadachi, Mir, M., 1982 | MR

[14] Shekhtman G. A., “Opredelenie parametrov sredy i traektorii stvola skvazhiny metodom VSP”, Geofizika, 1996, no. 5–6, 59–64

[15] Kakhaner D., Mouler K., Nesh S., Chislennye metody i programmnoe obespechenie, Mir, M., 2001

[16] Omelchenko O. K., “Numerical implementation of wave mode of definition of bottom hole coordinates”, Bull. Novosibirsk Computing Center. Ser. Mathematical Modeling in Geophysics, 1999, no. 5, 121–126 | Zbl

[17] Tsetsokho V. A., Vinogradov S. P., O ploschadnoi pristrelke pri luchevom trassirovanii v trekhmernoi sloisto-odnorodnoi srede, Preprint No 1093, IVMiMG SO RAN, Novosibirsk, 1997, 21 pp. | MR