Reconstruction of a consistent schedule in connection with change of the volume of a job
Zapiski Nauchnykh Seminarov POMI, Computational methods and algorithms. Part VII, Tome 139 (1984), pp. 5-21
Voir la notice de l'article provenant de la source Math-Net.Ru
Changes occurring in minimizing total penalty of consistent schedules due to the changes of the volume of a job are investigated. A reconstruction algorithm is developed, and an estimate of its complexity is obtained.
@article{ZNSL_1984_139_a0,
author = {T. E. Safonova},
title = {Reconstruction of a consistent schedule in connection with change of the volume of a job},
journal = {Zapiski Nauchnykh Seminarov POMI},
pages = {5--21},
publisher = {mathdoc},
volume = {139},
year = {1984},
language = {ru},
url = {http://geodesic.mathdoc.fr/item/ZNSL_1984_139_a0/}
}
T. E. Safonova. Reconstruction of a consistent schedule in connection with change of the volume of a job. Zapiski Nauchnykh Seminarov POMI, Computational methods and algorithms. Part VII, Tome 139 (1984), pp. 5-21. http://geodesic.mathdoc.fr/item/ZNSL_1984_139_a0/