Epq Model for Imperfect Production Processes With Rework and Random Preventive Machine Time for Deteriorating Items and Trended Demand
Yugoslav journal of operations research, Tome 25 (2015) no. 3, p. 421 .

Voir la notice de l'article provenant de la source eLibrary of Mathematical Institute of the Serbian Academy of Sciences and Arts

Economic production quantity (EPQ) model is analyzed for trended demand and the units which are subject to constant rate of deterioration. The system allows rework of imperfect units and preventive maintenance time is random. The proposed methodology, a search method used to study the model, is validated by a numerical example. Sensitivity analysis is carried out to determine the critical model parameters. It is observed that the rate of change of demand and the deterioration rate have a significant impact on the decision variables and the total cost of an inventory system. The model is highly sensitive to the production and demand rate.
Classification : 90B05.
Keywords: EPQ, Deterioration, Time-dependent Demand, Rework, Preventive Maintenance, Lost Sales.
@article{YJOR_2015_25_3_a7,
     author = {Nita H. Shah and Dushyantkumar G. Patel and Digeshkumar B. Shah},
     title = {Epq {Model} for {Imperfect} {Production} {Processes} {With} {Rework} and {Random} {Preventive} {Machine} {Time} for {Deteriorating} {Items} and {Trended} {Demand}},
     journal = {Yugoslav journal of operations research},
     pages = {421 },
     publisher = {mathdoc},
     volume = {25},
     number = {3},
     year = {2015},
     language = {en},
     url = {http://geodesic.mathdoc.fr/item/YJOR_2015_25_3_a7/}
}
TY  - JOUR
AU  - Nita H. Shah
AU  - Dushyantkumar G. Patel
AU  - Digeshkumar B. Shah
TI  - Epq Model for Imperfect Production Processes With Rework and Random Preventive Machine Time for Deteriorating Items and Trended Demand
JO  - Yugoslav journal of operations research
PY  - 2015
SP  - 421 
VL  - 25
IS  - 3
PB  - mathdoc
UR  - http://geodesic.mathdoc.fr/item/YJOR_2015_25_3_a7/
LA  - en
ID  - YJOR_2015_25_3_a7
ER  - 
%0 Journal Article
%A Nita H. Shah
%A Dushyantkumar G. Patel
%A Digeshkumar B. Shah
%T Epq Model for Imperfect Production Processes With Rework and Random Preventive Machine Time for Deteriorating Items and Trended Demand
%J Yugoslav journal of operations research
%D 2015
%P 421 
%V 25
%N 3
%I mathdoc
%U http://geodesic.mathdoc.fr/item/YJOR_2015_25_3_a7/
%G en
%F YJOR_2015_25_3_a7
Nita H. Shah; Dushyantkumar G. Patel; Digeshkumar B. Shah. Epq Model for Imperfect Production Processes With Rework and Random Preventive Machine Time for Deteriorating Items and Trended Demand. Yugoslav journal of operations research, Tome 25 (2015) no. 3, p. 421 . http://geodesic.mathdoc.fr/item/YJOR_2015_25_3_a7/