Simultaneous Determination of Economic Production Quantity and Economic Control Chart Design Under Truncated Weibull Shock Models
Yugoslav journal of operations research, Tome 9 (1999) no. 1, p. 35
Cet article a éte moissonné depuis la source eLibrary of Mathematical Institute of the Serbian Academy of Sciences and Arts
In this paper, a Fortran Computer Program for jointly determining
economic production quantity, inspection schedule and control chart design is
presented. The program is written based on the work of Rahim (1994 ). A Weibull
distributed shock model having increasing failure rate is considered and age
dependent salvage value of the equipment is utilized. The notion of a truncated
production cycle is introduced which begins when a new component is installed and
ends with a repair after the detection of a failure or after a specified number of
inspection intervals, whichever occurs first . The product quality characteristic of the
product is assumed to be normally distributed and monitored under the surveillance
of a control chart. The optimal values of the economic production quantity and the
economic design parameters are determined by minimizing the total expected cost
(inventory and quality control cost) per unit time. Both uniform and non-uniform
inspection schemes are presented. For a uniform scheme, the length of the inspection
intervals is kept constant. However, for a non-uniform scheme, the length of the
inspection intervals is regulated to maintain a constant integrated hazard rate over
each inspection interval.
Classification :
91B70 90B30
Keywords: Economic production quantity, inspection schedule, control chart design, Weibull shock models.
Keywords: Economic production quantity, inspection schedule, control chart design, Weibull shock models.
@article{YJOR_1999_9_1_a3,
author = {M.A. Rahim},
title = {Simultaneous {Determination} of {Economic} {Production} {Quantity} and {Economic} {Control} {Chart} {Design} {Under} {Truncated} {Weibull} {Shock} {Models}},
journal = {Yugoslav journal of operations research},
pages = {35 },
year = {1999},
volume = {9},
number = {1},
zbl = {1007.91531},
language = {en},
url = {http://geodesic.mathdoc.fr/item/YJOR_1999_9_1_a3/}
}
TY - JOUR AU - M.A. Rahim TI - Simultaneous Determination of Economic Production Quantity and Economic Control Chart Design Under Truncated Weibull Shock Models JO - Yugoslav journal of operations research PY - 1999 SP - 35 VL - 9 IS - 1 UR - http://geodesic.mathdoc.fr/item/YJOR_1999_9_1_a3/ LA - en ID - YJOR_1999_9_1_a3 ER -
%0 Journal Article %A M.A. Rahim %T Simultaneous Determination of Economic Production Quantity and Economic Control Chart Design Under Truncated Weibull Shock Models %J Yugoslav journal of operations research %D 1999 %P 35 %V 9 %N 1 %U http://geodesic.mathdoc.fr/item/YJOR_1999_9_1_a3/ %G en %F YJOR_1999_9_1_a3
M.A. Rahim. Simultaneous Determination of Economic Production Quantity and Economic Control Chart Design Under Truncated Weibull Shock Models. Yugoslav journal of operations research, Tome 9 (1999) no. 1, p. 35 . http://geodesic.mathdoc.fr/item/YJOR_1999_9_1_a3/