The Determination of Timing and Technology Level of an Abatement Investment
Yugoslav journal of operations research, Tome 8 (1998) no. 2, p. 257
Cet article a éte moissonné depuis la source eLibrary of Mathematical Institute of the Serbian Academy of Sciences and Arts
The main contribution of the paper is to reveal WHEN firms, in general, invest in anti-pollution equipment and WHAT technology level they adopt. Their responsive behavior toward the policy parameters such as observation probability, interest rate or penalty, and endogenous factors such as operating cost and emission volume is analyzed in this paper. The results show that an increase in observation probability leads to an increase in technology level and moves the schedule of abatement investment ahead. However, an increase in interest rate results in a decrease in technology level and delays the timing of abatement investment.
@article{YJOR_1998_8_2_a6,
author = {Miao-Sheng Chen and Chung-Chiang Chen},
title = {The {Determination} of {Timing} and {Technology} {Level} of an {Abatement} {Investment}},
journal = {Yugoslav journal of operations research},
pages = {257 },
year = {1998},
volume = {8},
number = {2},
zbl = {1007.91512},
language = {en},
url = {http://geodesic.mathdoc.fr/item/YJOR_1998_8_2_a6/}
}
TY - JOUR AU - Miao-Sheng Chen AU - Chung-Chiang Chen TI - The Determination of Timing and Technology Level of an Abatement Investment JO - Yugoslav journal of operations research PY - 1998 SP - 257 VL - 8 IS - 2 UR - http://geodesic.mathdoc.fr/item/YJOR_1998_8_2_a6/ LA - en ID - YJOR_1998_8_2_a6 ER -
Miao-Sheng Chen; Chung-Chiang Chen. The Determination of Timing and Technology Level of an Abatement Investment. Yugoslav journal of operations research, Tome 8 (1998) no. 2, p. 257 . http://geodesic.mathdoc.fr/item/YJOR_1998_8_2_a6/