@article{VYURU_2024_17_3_a6,
author = {V. A. Rasskazova},
title = {A decomposition approach in the problem of distribution-type planning with priority constraints},
journal = {Vestnik \^U\v{z}no-Uralʹskogo gosudarstvennogo universiteta. Seri\^a, Matemati\v{c}eskoe modelirovanie i programmirovanie},
pages = {87--101},
year = {2024},
volume = {17},
number = {3},
language = {en},
url = {http://geodesic.mathdoc.fr/item/VYURU_2024_17_3_a6/}
}
TY - JOUR AU - V. A. Rasskazova TI - A decomposition approach in the problem of distribution-type planning with priority constraints JO - Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie PY - 2024 SP - 87 EP - 101 VL - 17 IS - 3 UR - http://geodesic.mathdoc.fr/item/VYURU_2024_17_3_a6/ LA - en ID - VYURU_2024_17_3_a6 ER -
%0 Journal Article %A V. A. Rasskazova %T A decomposition approach in the problem of distribution-type planning with priority constraints %J Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie %D 2024 %P 87-101 %V 17 %N 3 %U http://geodesic.mathdoc.fr/item/VYURU_2024_17_3_a6/ %G en %F VYURU_2024_17_3_a6
V. A. Rasskazova. A decomposition approach in the problem of distribution-type planning with priority constraints. Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie, Tome 17 (2024) no. 3, pp. 87-101. http://geodesic.mathdoc.fr/item/VYURU_2024_17_3_a6/
[1] Borisovsky P.A., Eremeev A.V., “Production Scheduling of a Multi-Product Plant Using Integer Linear Programming and Evolutionary Computations”, Information Technologies, 21:6 (2015), 412–421
[2] Janak S.L., Floudas C.A., Kallrath J., Vormbrock N., “Production Scheduling of a Large-Scale Industrial Batch Plant: Short-Term and Medium-Term Scheduling”, Industrial and Engineering Chemistry Research, 45:25 (2006), 8234–8252 | DOI
[3] Slavyanov A.S., “Analysis and Practical Application of Resource Allocation Models”, Bulletin of Science and Practice, 4:9 (2018), 228–244 | MR
[4] Menshikh V.V., Samorokovsky A.F., Avsentev O.S., “Models of Resource Allocation Optimization when Solving the Control Problems in Organizational Systems”, Journal of Physics: Conference Series, 973:1 (2018), 12–40 | DOI
[5] Rezig S., Ezzeddine W., Turki S., Rezg N., “Mathematical Model for Production Plan Optimization: a Case Study of Descrete Event Systems”, Mathematics, 8:6 (2020), 955–971 | DOI
[6] Ganicheva A.V., Ganichev A.V., “A Method for Solving the Problem of Optimizing the Distribution of an Integer Resource”, Applied Mathematics and Control Sciences, 2021, no. 4, 42–55 | DOI
[7] Lazarev A.A., Musatova E.G., “Integer Statements of the Problem of Forming Railway Trains and Schedules of their Movement”, Management of Large Systems, 38 (2012), 161–169 | MR
[8] Gainanov D.N., Ignatov A.N., Naumov A.V., Rasskazova V.A., “On Track Procession Assignment Problem at the Railway Network Sections”, Automation and Remote Control, 81:6 (2020), 967–977 | DOI | MR | Zbl
[9] Kabulova E.G., “Intelligent Management of Multi-Stage Systems of Metallurgical Production”, Modeling, Optimization, and Information Technology, 7:1(24) (2018), 341–351
[10] Gitman M.B., Trusov P.V., Fedoseev S.A., “On Optimization of Metal Forming with Adaptable Characteristics”, Journal of Applied Mathematics and Computing, 7:2 (2020), 387–396 | DOI
[11] Gainanov D.N., Berenov D.A., “Algorithm for Predicting the Quality of the Product of Metallurgical Production” (Petrovac, 2017), CEUR Workshop Proceedings, 1987, 2017, 194–200
[12] Qiu Y., Wang L., Xu X., Fang X., Pardalos P., “Scheduling a Realistic Hybrid Flow Shop with Stage Skipping and Adjustable Processing Time in Steel Plants”, Applied Soft Computing, 64 (2018), 536–549 | DOI
[13] Kong Min, Pei Jun, Xu Jin, Liu Xinbao, Pardalos P., “A Robust Optimization Approach for Integrated Steel Production and Batch Delivery Scheduling with Uncertain Rolling Times and Deterioration Effect”, International Journal of Production Research, 58:17 (2020), 5132–5154 | DOI
[14] Long Jianyu, Sun Zhenzhong, Pardalos P., Bai Yun, Zhang Shaohui, Li Chuan, “A Robust Dynamic Scheduling Approach Based on Release Time Series Forecasting for the Steelmaking Continuous Casting Production”, Applied Soft Computing, 92 (2020), 106271 | DOI
[15] Gainanov D.N., Mladenovic N., Urosevic D., Rasskazova V.A., “Heuristic Algorithm for Finding the Maximum Independent Set with Absolute Estimate of the Accuracy” (Omsk, 2018), CEUR-WS Proceedings, 2098, 2018, 141–149