On time selection for track possession assignment at the railway station
Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie, Tome 12 (2019) no. 3, pp. 5-16 Cet article a éte moissonné depuis la source Math-Net.Ru

Voir la notice de l'article

We consider the problem on track possession assignment at the railway station. The problem is to determine the time during which the train traffic is interrupted for repair works at several railway tracks. To this end, we use a traffic schedule of the station in order to solve the problem on searching for the time interval having the following two properties. First, during this time interval, all track sections that are necessary to be repaired are vacant simultaneously. Second, this time interval has the maximum length. In addition, we solve two problems to determine the time interval having length that is not less than the length of the specified time interval in the following two cases. First, the desired time interval has the minimum number of occupied track sections that are necessary to be repaired. Second, the desired time interval has the minimum number of delayed (transferred) passenger/freight trains going through the tracks that are necessary to be repaired. All problems are solved by methods of mixed integer linear programming.
Keywords: track possession, schedule, mixed integer linear programming.
Mots-clés : station
@article{VYURU_2019_12_3_a0,
     author = {A. N. Ignatov and A. V. Naumov},
     title = {On time selection for track possession assignment at the railway station},
     journal = {Vestnik \^U\v{z}no-Uralʹskogo gosudarstvennogo universiteta. Seri\^a, Matemati\v{c}eskoe modelirovanie i programmirovanie},
     pages = {5--16},
     year = {2019},
     volume = {12},
     number = {3},
     language = {en},
     url = {http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/}
}
TY  - JOUR
AU  - A. N. Ignatov
AU  - A. V. Naumov
TI  - On time selection for track possession assignment at the railway station
JO  - Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie
PY  - 2019
SP  - 5
EP  - 16
VL  - 12
IS  - 3
UR  - http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/
LA  - en
ID  - VYURU_2019_12_3_a0
ER  - 
%0 Journal Article
%A A. N. Ignatov
%A A. V. Naumov
%T On time selection for track possession assignment at the railway station
%J Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie
%D 2019
%P 5-16
%V 12
%N 3
%U http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/
%G en
%F VYURU_2019_12_3_a0
A. N. Ignatov; A. V. Naumov. On time selection for track possession assignment at the railway station. Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie, Tome 12 (2019) no. 3, pp. 5-16. http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/

[1] Cordeau J.-F., Toth P., Vigo D., “A Survey of Optimization Models for Train Routing and Scheduling”, Transportation Science, 32:4 (1998), 380–404 | DOI | Zbl

[2] Peeters L. W. P., Cyclic Railway Timetable Optimization, PhD Thesis, Rotterdam, 2003

[3] Azanov V. M., Buyanov M. V., Gaynanov D. N., Ivanov S. V., “Algorithm and Software Development to Allocate Locomotives for Transportation of Freight Trains”, Bulletin of the South Ural State University. Series: Mathematical Modelling, Programming and Computer Software, 9:4 (2016), 73–85 | DOI | MR | Zbl

[4] Buyanov M. V., Kibzun A. I., “Algorithm of Effective Transportation Work for Cargo Traffic”, Bulletin of the South Ural State University. Series: Mathematical Modelling, Programming and Computer Software, 11:1 (2018), 75–83 | DOI | MR | Zbl

[5] Buyanov M. V., Ivanov S. V., Kibzun A. I., Naumov A. V., “Development of the Mathematical Model of Cargo Transportation Control on a Railway Network Segment Taking into Account Random Factors”, Informatics and Applications, 11:4 (2017), 85–93 (in Russian) | DOI

[6] Cacchiani V., Galli L., Toth P., “A Tutorial on Non-Periodic Train Timetabling and Platforming Problems”, EURO Journal of Transportation Logistics, 4:3 (2015), 285–320 | DOI

[7] Bobrovsky V. I., Kozachenko D. N., Vernigora R. V., Malashkin V. V., Functional Modeling of Railway Station Work, Dnepropetrovsk, 2015 (in Russian)

[8] Bosov A. V., Ignatov A. N., Naumov A. V., “Model of Transportation of Trains and Shunting Locomotives at a Railway Station for Evaluation and Analysis of Side-Collusion Probability”, Informatics and Applications, 12:3 (2018), 107–114 (in Russian) | DOI

[9] Technical Operation Rules of the Russian Federation Railways from 05.10.2018 (in Russian)

[10] Famurewa S. M., Xin T., Rantatalo M., Kumar U., “Optimisation of Maintenance Track Possession Time: a Tamping Case Study”, Proceedings of the Institution of Mechanical Engineers. Part F: Journal of Rail and Rapid Transit, 229:1 (2013), 12–22 | DOI

[11] Gustavsson E., Patriksson M., Stromberg A.-B. et al., “Preventive Maintenance Scheduling of Multi-Component Systems with Interval Costs”, Computers and Industrial Engineering, 76 (2014), 390–400 | DOI | MR

[12] Andrade A., Teixeira P., “Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry”, Transportation Research Record: Journal of the Transportation Research Board, 2261:1 (2011), 163–170 | DOI

[13] Higgins A., “Scheduling of Railway Track Maintenance Activities and Crews”, The Journal of the Operational Research Society, 49:10 (1998), 1026–1033 | DOI

[14] Albrecht A. R., Panton D. M., Lee D. H., “Rescheduling Rail Networks with Maintenance Disruptions Using Problem Space Search”, Computers and Operations Research, 40:3 (2013), 703–712 | DOI | MR | Zbl

[15] Forsgren M., Aronsson M., Gestrelius S., “Maintaining Tracks and Traffic Flow at the Same Time”, Journal of Rail Transport Planning and Management, 3:3 (2013), 111–123 | DOI