Mots-clés : station
@article{VYURU_2019_12_3_a0,
author = {A. N. Ignatov and A. V. Naumov},
title = {On time selection for track possession assignment at the railway station},
journal = {Vestnik \^U\v{z}no-Uralʹskogo gosudarstvennogo universiteta. Seri\^a, Matemati\v{c}eskoe modelirovanie i programmirovanie},
pages = {5--16},
year = {2019},
volume = {12},
number = {3},
language = {en},
url = {http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/}
}
TY - JOUR AU - A. N. Ignatov AU - A. V. Naumov TI - On time selection for track possession assignment at the railway station JO - Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie PY - 2019 SP - 5 EP - 16 VL - 12 IS - 3 UR - http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/ LA - en ID - VYURU_2019_12_3_a0 ER -
%0 Journal Article %A A. N. Ignatov %A A. V. Naumov %T On time selection for track possession assignment at the railway station %J Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie %D 2019 %P 5-16 %V 12 %N 3 %U http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/ %G en %F VYURU_2019_12_3_a0
A. N. Ignatov; A. V. Naumov. On time selection for track possession assignment at the railway station. Vestnik Ûžno-Uralʹskogo gosudarstvennogo universiteta. Seriâ, Matematičeskoe modelirovanie i programmirovanie, Tome 12 (2019) no. 3, pp. 5-16. http://geodesic.mathdoc.fr/item/VYURU_2019_12_3_a0/
[1] Cordeau J.-F., Toth P., Vigo D., “A Survey of Optimization Models for Train Routing and Scheduling”, Transportation Science, 32:4 (1998), 380–404 | DOI | Zbl
[2] Peeters L. W. P., Cyclic Railway Timetable Optimization, PhD Thesis, Rotterdam, 2003
[3] Azanov V. M., Buyanov M. V., Gaynanov D. N., Ivanov S. V., “Algorithm and Software Development to Allocate Locomotives for Transportation of Freight Trains”, Bulletin of the South Ural State University. Series: Mathematical Modelling, Programming and Computer Software, 9:4 (2016), 73–85 | DOI | MR | Zbl
[4] Buyanov M. V., Kibzun A. I., “Algorithm of Effective Transportation Work for Cargo Traffic”, Bulletin of the South Ural State University. Series: Mathematical Modelling, Programming and Computer Software, 11:1 (2018), 75–83 | DOI | MR | Zbl
[5] Buyanov M. V., Ivanov S. V., Kibzun A. I., Naumov A. V., “Development of the Mathematical Model of Cargo Transportation Control on a Railway Network Segment Taking into Account Random Factors”, Informatics and Applications, 11:4 (2017), 85–93 (in Russian) | DOI
[6] Cacchiani V., Galli L., Toth P., “A Tutorial on Non-Periodic Train Timetabling and Platforming Problems”, EURO Journal of Transportation Logistics, 4:3 (2015), 285–320 | DOI
[7] Bobrovsky V. I., Kozachenko D. N., Vernigora R. V., Malashkin V. V., Functional Modeling of Railway Station Work, Dnepropetrovsk, 2015 (in Russian)
[8] Bosov A. V., Ignatov A. N., Naumov A. V., “Model of Transportation of Trains and Shunting Locomotives at a Railway Station for Evaluation and Analysis of Side-Collusion Probability”, Informatics and Applications, 12:3 (2018), 107–114 (in Russian) | DOI
[9] Technical Operation Rules of the Russian Federation Railways from 05.10.2018 (in Russian)
[10] Famurewa S. M., Xin T., Rantatalo M., Kumar U., “Optimisation of Maintenance Track Possession Time: a Tamping Case Study”, Proceedings of the Institution of Mechanical Engineers. Part F: Journal of Rail and Rapid Transit, 229:1 (2013), 12–22 | DOI
[11] Gustavsson E., Patriksson M., Stromberg A.-B. et al., “Preventive Maintenance Scheduling of Multi-Component Systems with Interval Costs”, Computers and Industrial Engineering, 76 (2014), 390–400 | DOI | MR
[12] Andrade A., Teixeira P., “Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry”, Transportation Research Record: Journal of the Transportation Research Board, 2261:1 (2011), 163–170 | DOI
[13] Higgins A., “Scheduling of Railway Track Maintenance Activities and Crews”, The Journal of the Operational Research Society, 49:10 (1998), 1026–1033 | DOI
[14] Albrecht A. R., Panton D. M., Lee D. H., “Rescheduling Rail Networks with Maintenance Disruptions Using Problem Space Search”, Computers and Operations Research, 40:3 (2013), 703–712 | DOI | MR | Zbl
[15] Forsgren M., Aronsson M., Gestrelius S., “Maintaining Tracks and Traffic Flow at the Same Time”, Journal of Rail Transport Planning and Management, 3:3 (2013), 111–123 | DOI