An approximate economically optimal inspection interval for production processes with finite run length
Control and Cybernetics, Tome 37 (2008) no. 1, pp. 191-204.

Voir la notice de l'article provenant de la source The Polish Digital Mathematics Library

@article{CC_2008_37_1_a9,
     author = {Deeb, Ali Mashat and Hryniewicz, Olgierd},
     title = {An approximate economically optimal inspection interval for production processes with finite run length},
     journal = {Control and Cybernetics},
     pages = {191--204},
     publisher = {mathdoc},
     volume = {37},
     number = {1},
     year = {2008},
     zbl = {1153.90382},
     language = {en},
     url = {http://geodesic.mathdoc.fr/item/CC_2008_37_1_a9/}
}
TY  - JOUR
AU  - Deeb, Ali Mashat
AU  - Hryniewicz, Olgierd
TI  - An approximate economically optimal inspection interval for production processes with finite run length
JO  - Control and Cybernetics
PY  - 2008
SP  - 191
EP  - 204
VL  - 37
IS  - 1
PB  - mathdoc
UR  - http://geodesic.mathdoc.fr/item/CC_2008_37_1_a9/
LA  - en
ID  - CC_2008_37_1_a9
ER  - 
%0 Journal Article
%A Deeb, Ali Mashat
%A Hryniewicz, Olgierd
%T An approximate economically optimal inspection interval for production processes with finite run length
%J Control and Cybernetics
%D 2008
%P 191-204
%V 37
%N 1
%I mathdoc
%U http://geodesic.mathdoc.fr/item/CC_2008_37_1_a9/
%G en
%F CC_2008_37_1_a9
Deeb, Ali Mashat; Hryniewicz, Olgierd. An approximate economically optimal inspection interval for production processes with finite run length. Control and Cybernetics, Tome 37 (2008) no. 1, pp. 191-204. http://geodesic.mathdoc.fr/item/CC_2008_37_1_a9/