Parallel machine scheduling with uncertain communication delays
RAIRO - Operations Research - Recherche Opérationnelle, Tome 37 (2003) no. 1, pp. 1-16
Cet article a éte moissonné depuis la source Numdam

Voir la notice de l'article

This paper is concerned with scheduling when the data are not fully known before the execution. In that case computing a complete schedule off-line with estimated data may lead to poor performances. Some flexibility must be added to the scheduling process. We propose to start from a partial schedule and to postpone the complete scheduling until execution, thus introducing what we call a stabilization scheme. This is applied to the m machine problem with communication delays: in our model an estimation of the delay is known at compile time; but disturbances due to network contention, link failures, ... may occur at execution time. Hence the processor assignment and a partial sequencing on each processor are determined off-line. Some theoretical results for tree-like precedence constraints and an experimental study show the interest of this approach compared with fully on-line scheduling.

DOI : 10.1051/ro:2003011
Classification : 90B35, 90B25
Keywords: parallel computing, scheduling with communication delays, disturbances on communication delays, list scheduling, flexibility
@article{RO_2003__37_1_1_0,
     author = {Moukrim, Aziz and Sanlaville, Eric and Guinand, Fr\'ed\'eric},
     title = {Parallel machine scheduling with uncertain communication delays},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {1--16},
     year = {2003},
     publisher = {EDP-Sciences},
     volume = {37},
     number = {1},
     doi = {10.1051/ro:2003011},
     mrnumber = {1999919},
     zbl = {1062.90028},
     language = {en},
     url = {http://geodesic.mathdoc.fr/articles/10.1051/ro:2003011/}
}
TY  - JOUR
AU  - Moukrim, Aziz
AU  - Sanlaville, Eric
AU  - Guinand, Frédéric
TI  - Parallel machine scheduling with uncertain communication delays
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 2003
SP  - 1
EP  - 16
VL  - 37
IS  - 1
PB  - EDP-Sciences
UR  - http://geodesic.mathdoc.fr/articles/10.1051/ro:2003011/
DO  - 10.1051/ro:2003011
LA  - en
ID  - RO_2003__37_1_1_0
ER  - 
%0 Journal Article
%A Moukrim, Aziz
%A Sanlaville, Eric
%A Guinand, Frédéric
%T Parallel machine scheduling with uncertain communication delays
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 2003
%P 1-16
%V 37
%N 1
%I EDP-Sciences
%U http://geodesic.mathdoc.fr/articles/10.1051/ro:2003011/
%R 10.1051/ro:2003011
%G en
%F RO_2003__37_1_1_0
Moukrim, Aziz; Sanlaville, Eric; Guinand, Frédéric. Parallel machine scheduling with uncertain communication delays. RAIRO - Operations Research - Recherche Opérationnelle, Tome 37 (2003) no. 1, pp. 1-16. doi: 10.1051/ro:2003011

Cité par Sources :