On the two-stage hybrid flow shop with dedicated machines
RAIRO - Operations Research - Recherche Opérationnelle, Tome 49 (2015) no. 4, pp. 795-804
Cet article a éte moissonné depuis la source Numdam
In this paper we develop new elimination rules and discuss several polynomially solvable cases for the two-stage hybrid flow shop problem with dedicated machines. We also propose a worst case analysis for several heuristics. Furthermore, we point out and correct several errors in the paper of Yang [J. Yang, A two-stage hybrid flow shop with dedicated machines at the first stage. Comput. Oper. Res. 40 (2013) 2836−2843].
Reçu le :
Accepté le :
DOI : 10.1051/ro/2015005
Accepté le :
DOI : 10.1051/ro/2015005
Classification :
90B35, 90B30
Keywords: Scheduling, hybrid flow shop, dedicated machines, worst case analysis, elimination rule
Keywords: Scheduling, hybrid flow shop, dedicated machines, worst case analysis, elimination rule
Affiliations des auteurs :
Hadda, Hatem 1 ; Hajji, Mohamed Karim 2 ; Dridi, Najoua 2
@article{RO_2015__49_4_795_0,
author = {Hadda, Hatem and Hajji, Mohamed Karim and Dridi, Najoua},
title = {On the two-stage hybrid flow shop with dedicated machines},
journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
pages = {795--804},
year = {2015},
publisher = {EDP-Sciences},
volume = {49},
number = {4},
doi = {10.1051/ro/2015005},
zbl = {1323.90021},
language = {en},
url = {http://geodesic.mathdoc.fr/articles/10.1051/ro/2015005/}
}
TY - JOUR AU - Hadda, Hatem AU - Hajji, Mohamed Karim AU - Dridi, Najoua TI - On the two-stage hybrid flow shop with dedicated machines JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2015 SP - 795 EP - 804 VL - 49 IS - 4 PB - EDP-Sciences UR - http://geodesic.mathdoc.fr/articles/10.1051/ro/2015005/ DO - 10.1051/ro/2015005 LA - en ID - RO_2015__49_4_795_0 ER -
%0 Journal Article %A Hadda, Hatem %A Hajji, Mohamed Karim %A Dridi, Najoua %T On the two-stage hybrid flow shop with dedicated machines %J RAIRO - Operations Research - Recherche Opérationnelle %D 2015 %P 795-804 %V 49 %N 4 %I EDP-Sciences %U http://geodesic.mathdoc.fr/articles/10.1051/ro/2015005/ %R 10.1051/ro/2015005 %G en %F RO_2015__49_4_795_0
Hadda, Hatem; Hajji, Mohamed Karim; Dridi, Najoua. On the two-stage hybrid flow shop with dedicated machines. RAIRO - Operations Research - Recherche Opérationnelle, Tome 49 (2015) no. 4, pp. 795-804. doi: 10.1051/ro/2015005
Cité par Sources :
