Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning
RAIRO - Operations Research - Recherche Opérationnelle, Tome 44 (2010) no. 2, pp. 107-118

Voir la notice de l'article provenant de la source Numdam

This paper studies scheduling problems which include a combination of nonlinear job deterioration and a time-dependent learning effect. We use past sequence dependent (p-s-d) setup times, which is first introduced by Koulamas and Kyparisis [Eur. J. Oper. Res. 187 (2008) 1045-1049]. They considered a new form of setup times which depend on all already scheduled jobs from the current batch. Job deterioration and learning co-exist in various real life scheduling settings. By the effects of learning and deterioration, we mean that the processing time of a job is defined by increasing function of its execution start time and a function of the total normal processing time of jobs scheduled prior to it. The following objectives are considered: single machine makespan and sum of completion times (square) and the maximum lateness. For the single-machine case, we derive polynomial-time optimal solutions.

DOI : 10.1051/ro/2010009
Classification : 90B35
Keywords: scheduling, single machine, past sequence dependent (p-s-d) setup times, time-dependent learning effect, deterioration jobs
@article{RO_2010__44_2_107_0,
     author = {Duran Toksar{\i}, M. and Oron, Daniel and G\"uner, Ertan},
     title = {Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {107--118},
     publisher = {EDP-Sciences},
     volume = {44},
     number = {2},
     year = {2010},
     doi = {10.1051/ro/2010009},
     mrnumber = {2666484},
     zbl = {1188.90112},
     language = {en},
     url = {http://geodesic.mathdoc.fr/articles/10.1051/ro/2010009/}
}
TY  - JOUR
AU  - Duran Toksarı, M.
AU  - Oron, Daniel
AU  - Güner, Ertan
TI  - Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 2010
SP  - 107
EP  - 118
VL  - 44
IS  - 2
PB  - EDP-Sciences
UR  - http://geodesic.mathdoc.fr/articles/10.1051/ro/2010009/
DO  - 10.1051/ro/2010009
LA  - en
ID  - RO_2010__44_2_107_0
ER  - 
%0 Journal Article
%A Duran Toksarı, M.
%A Oron, Daniel
%A Güner, Ertan
%T Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 2010
%P 107-118
%V 44
%N 2
%I EDP-Sciences
%U http://geodesic.mathdoc.fr/articles/10.1051/ro/2010009/
%R 10.1051/ro/2010009
%G en
%F RO_2010__44_2_107_0
Duran Toksarı, M.; Oron, Daniel; Güner, Ertan. Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning. RAIRO - Operations Research - Recherche Opérationnelle, Tome 44 (2010) no. 2, pp. 107-118. doi: 10.1051/ro/2010009

Cité par Sources :